Features
Living area
Additional Information
The Ténor B model includes a poured-concrete basement that can be built as a standard basement, a half-basement, or a walkout basement, depending on the lot. This space is delivered unfinished, leaving room for future customization. Like all our single-family models, the Ténor B can be adjusted to accommodate certain modifications where permitted. Typical construction time ranges from six to nine months, including the planning stage, and the home is protected by the GCR warranty. The design emphasizes natural light through its well-planned open-concept layout. The garage is delivered unfinished, and the roof features architectural shingles with a limited lifetime warranty.
Key Features of the Ténor B Model
The Ténor B stands out for the option to add an attached garage with only minor plan adjustments, making it a practical choice for buyers looking for extra storage or a protected entry. The master bedroom can also be configured with a walk-in closet in place of the ensuite bathroom, depending on the buyer’s preferences and the needs of the project. This flexibility allows the upper floor to be adapted to the family’s lifestyle while preserving the functional balance and simplicity that define the model.
How This Model Adapts to Your Lot and Project
The Ténor B model is offered in several of our communities, depending on project requirements and lot conditions. Its design can be adapted to sloped lots and can accommodate a walkout basement where topography allows. Its balanced footprint makes it easy to position on a variety of lot configurations, and exterior cladding may vary according to the standards established for each project. Front landscaping is included, and where municipal services are not available, the well and septic system are installed according to local requirements.
Organize your decisions. Here, we structure priorities, budget, and the project’s overall direction to ensure logical and realistic progress. A key step for moving forward methodically and avoiding unnecessary adjustments.
Plan your project